US Army Corps of Engineers (COE) through AICI
Developed complete construction shop drawings for electrical and
Developed complete construction shop drawings for electrical and
Develop shop drawings for all outside electrical network distributions for low Voltage and medium voltage network:
Medium voltage for multiple step-down transformers serving workshops building, management office building and other facilities.
Electrical low voltage for different buildings.
Fiber optic network for communication and security system.
Firefighting piping network.
Plumbing network including drainage system and water supply.
Calculation sheet and design criteria.
Short circuit coordination & selectivity studies.
Prepared Bid Design Drawings for the following:
Electric upgrade of armament workshops # 1.
Armament workshop # 3.
Generator workshop.
Provided complete design Documents for Upgrade of Electrical Networks at Armament Workshop # 3 project. The design work includes the following:
Design drawings of infrastructure MV network, 11 KV switchgear, power transformers, LV network and LV main switch boards for each workshop facility.
Technical specification.
Calculation sheet and design criteria.
Short circuit coordination & selectivity studies.
Conducted Coordination / selectivity studies for a CONTRACK International project in El Bahrain.
Provided infrastructure communication tender documents for CONTRACK International projects in Afghanistan and Abu Dhabi.
Provided Electrical Design Drawings for the new US Embassy Buildings in each of Malta & Latvia, including:
Design drawings, calculation sheets, and technical specification for the new mobilization security systems
Shop drawings for all underground utilities inside the two embassy layout areas [MV and LV networks, water supply and drainage networks, Fire fighting networks, and rain water drain system.
Completed Coordination Drawings of all electrical & Mechanical utilities.
Reviewed the design of the Malta & Latvia Main buildings, which was designed by a US Design office.
Package A (CONTRACK):
Complete electrical shop drawings of Parachute building and Unit Training Device (UTD).
Coordination study and network load flow analysis for the complete air base electrical network.
Materials selection according to the US Army Corps of Engineers specifications.
Package B (AICI):
Complete electrical design of 22 facility buildings serving the F-16 Air fighter.
Design infrastructure network for low voltage and medium voltage network.
Calculation sheets for Lightning Risk Assessment calculations, short circuits, voltage drop and selectivity study.
Technical support of project execution and materials identification.
Coordination drawings of all electrical & Mechanical utilities for all project facilities.
Completed electrical and mechanical design for the military side air base to include service and dormant facilities.
Completed electrical and mechanical design of the site work utilities for medium voltage, low voltage, Transformer Substations, water network, sewer network, firefighting network and irrigation network including Potable Pump Station, Sewer Treatment Plant and Irrigation stations.
Site lighting complete design for all roads, Apron air field lighting.
Specifications and bill of quantities for all MEP utilities according to CSI standards
Complete electrical and mechanical design for the Ammunitions building to accommodate the weapons testing.
The design drawings was developed to analyze and check the consistency between the EAF design and the MBDA requirements necessary for the weapon's safe operability in the pyrotechnical infrastructure. military side air base to include service and dormant facilities.
Complete electrical and mechanical design of the site work utilities related to the safety and security control operation, low voltage network, Transformer Substations, water network, sewer network, firefighting network.
Site lighting complete design for all border's roads, and service entrance lighting.
Specifications and bill of quantities for all MEP utilities according to CSI standards.
As the main electrical consulting office for MFO, we provided Electrical Design projects for both North Camp at Arish, (North Sinai) & South Camp at Sharm El Sheikh (South Sinai).
The Projects implemented by ECE involved the followings:
- Design of Medium Voltage Network for South Camp to replace existing Diesel Power Plants (through COE) – Year 2001.
- Design of Medium Voltage Network for North Camp to replace existing Diesel Power Plants.
- Coordination & Selectivity Studies for Electrical Networks at both North & South Camps.
- Power Factor Correction and Load Reallocation at both North Camp & South Camp.
- Design of 22KV Automatic Voltage Regulator at North Camp.
- Rehabilitation of existing 6.3 KV Switchgear at north Camp.
- Provide new Switching Gear 22 KV at South Camp to replace the old one including replacement of 10 substations 22/0.4 KV.
- Design of New Substation SS1X at North Camp [2x1000 KVA Transformers].
- Design of New Substation SS11X [500 KVA] and Low Voltage Distribution System.
ECE was requested to perform a new design for a Reverse Osmosis (RO) System suitable to produce 600 m3 daily of water to serve the South Camp compound with potable water. The system is integrated as part of the sea water wells.
Our office has been working to purge, clean and validate the wells operation to produce the amount of water needed for the purpose.
As well as, we have been tasked to clean, purge and provide camera inspections for the As nine deep wells 100 meter at North Camp at Arish, (North Sinai).
The inspection went as expected and a new wells design with pumping category has been submitted to MFO for the system improvements and considerations.
A new electrical network and grounding system has been submitted to improve the system operation.
Another major project is the complete design of a new Laundry building for 1000 military users with different ranks. The design includes architect design, equipment layout, function and operation procedures, electrical, mechanical and plumbing networks for the entire facility
ECE provided the following design tasks:
Preparation of all Electrical, sanitary, mechanical works for 30 high rise buildings (each 11 floors).
Preparation of all infrastructure stations and networks for the compound which includes the following:
MV Switchgear (11KV) networks and Transformer Substation 11/0.4 KV.
LV Networks to all housing, street lighting, and pump station.
Communication & TV networks.
Fire Alarm System Network.
Sanitary Networks includes Potable water, sewer, Firefighting and irrigation systems.
Electrical and mechanical design for Water Pump station including Potable water pumps, irrigation pumps and Fire Fighting pumps.
ECE provided all Electrical and Mechanical design documents for Webster University at Ghana. Our task was as follows:
Electrical Design works:
ECE provided all Electrical and Mechanical design documents
for Webster University at Ghana. Our task was as follows:
Electrical Design works:
Lighting & power systems.
Telephone and data systems.
CCTV System.
Security Systems.
Grounding and Lightning protection systems
Transformer Substation (630 KVA- 22/0.4 KV)
Emergency Generator package (500 KW,0.4KV).
Mechanical Design Works:
HVAC system including central, package & split units.
Fire Fighting system.
Water Supply System.
Sewer Drainage System.
Pump Station for water and Fire Fighting systems.
Lift station.
ECE provided all Electrical new redesign documents for the 16 Clusters to include multiple residential building and service utilities. Our task were as follows:
Electrical Design works:
Lighting & power systems.
Panel boards new design.
New riser diagrams study and analysis to include voltage drop calculations, short circuit, demand loads.
Transformer Substation calculations in accordance with loading capacity.
Emergency Generator sizing and downstream load calculations.
ECE provided all Electrical and Mechanical design documents for Webster University at Ghana. Our task was as follows:
Electrical Design works:
Lighting & power systems.
Communications systems.
CCTV System.
Security Systems.
Sound Systems.
Parking system.
Grounding and Lightning protection systems
Transformer Substation (2x1000 KVA- 22/0.4 KV)
Emergency Generator package (250 KW,0.4KV).
Mechanical Design Works:
HVAC system including chilled water plant.
Fire Fighting system.
Water Supply System.
Sewer Drainage System.
Pump Station for water and Fire Fighting systems.
Solar system.
Develop all electrical design activities for 12 lounges in three airports:
King Abdel Aziz International Airport “KAIA” Jeddah.
King Khaled International Airport – Riyad.
New Madinah Airport – Madinah.
The Projects implemented by ECE involved the followings:
Design of Low Voltage Network for all lounges.
Design of UPS network for Flight Information Display System FIDS.
Design of security network for the system operation.
Design communication network for the local lounges and its interface with the larger airport systems.
The Projects implemented by ECE involved the following:
Shop drawings for all electrical power installations inside buildings.
Coordination drawings for all electrical and mechanical works.
Calculation studies of voltage drops, short circuit and earth fault analysis.
Redesign panel boards to achieve load balance and circuit calculations.
Infrastructure work for lighting and power distribution for site work networks. .
The Projects implemented by ECE involved the following:
Shop drawings for all electrical power installations inside buildings.
Coordination drawings for all electrical and mechanical works.
Calculation studies of voltage drops, short circuit and earth fault analysis.
Redesign panel boards to achieve load balance and circuit calculations.
Infrastructure work for lighting and power distribution for site work networks. .
Electrical design documentation for the upcoming International Paint Shop project in Abu Rawash.
Electrical design efforts for the extensive GB Polo bus manufacturing facility within the Industrial Zone.
Electrical Design undertakings for the new Body Shop catering to 'Verna', 'Elantra' cars, and Mitsubishi trucks.
Revamped designs for fire alarm systems connection across all factories.
Innovations in design for service centers, encompassing CITI, Q22, buses, trucks, and more.
A fresh body shop establishment in Badr City.
The introduction of a new office building, warehouse, and IT facility at Abu Rawash.
Detailed electrical design for the upcoming Service Center in Damietta.
Design of a state-of-the-art fire alarm and firefighting system for the Prima Paint Shop facility. This involved replacing the obsolete, non-functional system with a brand-new setup. The firefighting capacity was upgraded to incorporate 150 CO2 cylinders and a modernized firefighting control system. A new Cause and Effect sequence was integrated to adhere to the latest safety and fire code standards outlined by NFPA.
Development of a new firefighting network for the Truck factory in Sadat City. The system encompasses fire pumping stations with a capacity of 1000 gallons per minute (GPM) and an extensive network of 3000 linear meters of piping.
Comprehensive electrical design documentation for a new factory located in 6th October City, encompassing all on-site installations. (2012).
Thorough design for sanitary and plumbing systems.
Detailed design for the firefighting network and associated pump rooms.
ECE undertook the entirety of electrical interior design for the office building in Dokki, covering the following aspects:
1. Full distribution system wiring.
2. Power and lighting systems.
3. Communication systems.
4. Data networks.
5. UPS system design."
ECE conducted a comprehensive site assessment for the fire alarm system, including its operational sequence, for both the main headquarters in Maadi and the Call Center building at Smart Village.
We meticulously developed cause-and-effect matrices for both structures, meticulously adhering to the NFPA 72 edition of 2016. This validation process ensured the fire response protocols and safety measures were in place for the protection of occupants and property.
Furthermore, we conducted a thorough examination of lightning protection and earthing grid systems for both buildings. Our team also provided on-site supervision to contractors during the implementation of recommended fixes and code modifications, aligning with NFPA 780 standards
Designing HVAC systems for 11 power plants in Saudi Arabia (El Safwa Cement Line) in 2008.
Drafting tender documents for HVAC system design for TERGA Power Plant in Libya in 2009 (project not completed).
Offering preliminary design and Bill of Quantities (BOQ) for electrical infrastructure networks for a large housing community in El Dammam, Saudi Arabia in 2010.
Providing detailed shop drawings and isometric drawings for all mechanical piping at Ezz Steel Factory (ESF) in Ein El Sokhna.
Designing control systems for potable water stations and water tanks at El Sokhna.
Supplying shop drawings for the Ein Saleh Project in Algeria.
Compiling the Electrical infrastructure BOQ for Kuwait University in 2010.
Creating Electrical shop drawings for Bar Mill 1 & 2 at El Ezz Factory (EFS).
Designing control systems for potable water stations and water tanks at El Giza Power Plant.
Preparing Electrical infrastructure BOQ for King Abdullah Petroleum Company in Saudi Arabia.
Compiling Electrical infrastructure BOQ for King Abdullah Stadium in Saudi Arabia.
Preparing Electrical infrastructure BOQ for the El Jahezia Project in Abu Dhabi.
Generating Electrical-Mechanical shop drawings for the Central Processing Facility System in El-Merk, Algeria.
ECE has been entrusted with the comprehensive task of developing a detailed materials take-off and creating a construction bill of materials for the electrical and mechanical networks spanning the main hospital building, service facility, and site network.
This involves meticulously surveying all MEP (Mechanical, Electrical, Plumbing) drawings and bill of quantities. ECE will then compile a comprehensive breakdown of the required purchase materials for the entirety of MEP activities, encompassing electrical networks, HVAC, plumbing, compressed air, and all low-current systems.
Furthermore, our scope extends to conducting a thorough site network survey and developing a materials list for all on-site activities
ECE has been granted the full responsibility for creating As-Built drawings pertaining to the electrical networks of both the main building B2 and the service basement connections.
This undertaking encompasses on-site inspections and thorough verification of installations for all executed electrical and mechanical work, as well as building management systems.
In addition to this, the As-Built process encompasses low-current systems, communication networks, and security systems.
“6 October Low Cost Housing [El Haram City]”- (2008- On going)
ECE provided the following design works:
Infrastructure design documents for about 2000 Acres (70 000 land Pieces).
Our task includes [22KV Switchgear Buildings, 22KV network, 22/0.4 KV Transformer Substations, Low voltage Network, Housing connections, and street lighting].
Interior Design of Electrical works for main buildings:
- Al Amal Children housing (homeless girls housing and education facility).
- Main Buildings (Sales office , Hotels, Administrative buildings, Tamr Henna Building)
Textile factory (El Maliaka Factory).
Main Mosque.
Lighting system of El Gouna Club football playing yard.
Interior Electrical works for all housing types.
“6 October Low Cost Housing [El Haram City]”- (2008- On going)
ECE provided the following design works:
Infrastructure design documents for about 2000 Acres (70 000 land Pieces).
Our task includes [22KV Switchgear Buildings, 22KV network, 22/0.4 KV Transformer Substations, Low voltage Network, Housing connections, and street lighting].
Interior Design of Electrical works for main buildings:
- Al Amal Children housing (homeless girls housing and education facility).
- Main Buildings (Sales office , Hotels, Administrative buildings, Tamr Henna Building)
Textile factory (El Maliaka Factory).
Main Mosque.
Lighting system of El Gouna Club football playing yard.
Interior Electrical works for all housing types.
ECE provided the following design works:
Infrastructure design documents for about 700 Acres.
Our task includes [22KV Switchgear Buildings, 11KV network, 11/0.4 KV Transformer Substations, Low voltage Network, Housing connections, and street lighting].
Interior Design of Electrical works for all housing units.
A) MAKADY New town housing – Electrical & Sanitary Design works – Hurgadah:
ECE provided the following design documents and site supervision for the following:
Infrastructure electromechanical design works which includes 22KV network, 22/0.4 KV Transformer Substations, Low Voltage Network, Housing connections, Street Lighting, Water supply Network, sewer network and irrigation networks.
Infra structure stations which includes the following [ Main 22 KV Switchgear, Transformer substations 22/0.4KV, Desalination Plant and wells, Potable water station, sewer station, sewer treatment station, irrigation station.
Interior Design of Electrical, HVAC and sanitary works for all housing units.
Tamr Henna and El Khan Buildings.
Main gate and security building.
MAKADY HEIGHTS – MAKADY
Infrastructure Utilities
Complete electrical design for the Makady Heights new developments resort to include service facilities.
Complete electrical design of the site work utilities for medium voltage, low voltage, Transformer Substations network.
Site lighting complete design for all roads, green area lighting.
Power feeders network for swimming pools, lakes, food court and service area.
Integrate the new design with the existing Makady residential area network.
Complete Triple Play fiber optic network for Communication, TV and Internet. A separate Fiber Optic network for CCTV security observations.
*A) MAKADY HOTEL (4 Stars).
ECE provided the following design works:
All interior electrical and mechanical documents as well as all infrastructure mechanical and electrical works.
Infra structure stations: Transformer substation, Sewer station, water and fire fighting pump stations.
Site lighting.
B) MAKADY Stadium (2022)
ECE provided the following design works:
All interior electrical and mechanical documents as well as all infrastructure mechanical and electrical works.
Stadium professional lighting design with 200 LED fixtures suitable for competitions and broadcasting.
ECE provided the following design works:
Substation generating plant equipment's with all network connection.
Overhead transmission line 33kV from the generating plant to urban areas of 2500 customers.
Design distribution transformers to different areas.
Network analysis for short circuit and load flow calculation for the whole network.
Calculate the sag effect of the overhead transmission lines for the 40 Km distribution network.
ECE provided the following design works:
All interior electrical and mechanical documents.
All infrastructure mechanical and electrical works.
Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations].
Site lighting.
ECE provided the following design works:
All interior electrical power, decorative lighting, Cinema operation system equipment control, air condition power.
All Fire alarm system, sound system, access control system and low current communication network.
Complete design for the main distribution boards and the power feeders network grid for all the building.
Emergency power network from generator and essential network from UPS system.
ECE provided the following design works:
All interior electrical and mechanical documents.
All infrastructure mechanical and electrical works.
Infra structure stations [Transformer substation, Sewer station, water and fire fighting pump stations].
Site lighting.
ECE provided all Electrical and Mechanical design documents
for CACC Customer Service building. Our task was as follows:
Electrical Design works:
- Lighting & power systems.
- Communication systems.
- CCTV System.
- Security Systems.
- Grounding systems
Mechanical Design Works:
- HVAC system including Fan Coil Units.
- Fire Fighting system.
- Water Supply System.
- Sewer Drainage System.
ECE provided the following engineering works:
Review design for the low current system and provide comments for complete construction documents.
Develop shop drawings for the fire alarm system network for all towers.
Develop show drawings for the communication data and WIFI network for all towers.
Develop complete riser diagrams for all communications network to include the interface and integration of the entire project.
ECE provided the following design works:
All interior decorative lighting, power and air conditioning system.
All infrastructure electrical works.
Site lighting and Infra structure stations [Transformer substation and outside network].
Low current and safety systems.
Communication and security systems.
Soma Bay Resort (1996 – 1998).
Infrastructure design for MV Networks.
Utility area infrastructure design for power and communication systems
NOC (Network Operation Center) [1996-1997]
Complete electrical Interior design works.
All data system network needed for high rate standard computer networks.
All communication and fire alarm system networks.
HARD ROCK CAFÉ – Cairo Meridian [1998]
Complete electrical Interior design works including lighting, power , data , sound system racks, and communication systems according to Hard Rock standards.
All main Connections of power supply
Egyptian Chinese Company – Industrial Zone , South /West of Suez [2003-2005]
Review all infra structure design documents prepared by Arab Contractors.
Supervision of all electrical infra structure works for the zone.
Supervising installation of Transformer substations, water & sewer stations.